Chapter 3 Social, Economic, and Environmental
Resources and Impacts
Back to Chapter
Summary
This chapter discusses the existing study area environment and anticipated impacts to social, economic, and environmental resources within the study area from implementation of the improvements described in the previous chapter. Only those issues pertinent to the project are discussed.
To establish the existing social, economic and environmental conditions within the study area: 1) existing information sources were assembled and reviewed; 2) additional analyses were conducted, where appropriate; 3) interviews were conducted with local, state, and federal agencies; 4) public information meetings were conducted with residents of the study area; 5) knowledgeable persons within the study area were interviewed; and 6) field reviews of the area were conducted. This information was then compared with standards or criteria to determine the positive or negative effects of the project alternatives.
The discussion that follows documents the findings of the information gathering activities and any analyses conducted, defines the criteria used to ascertain impacts, and then describes the impacts expected from implementing the project alternatives.
3.1 Traffic Operations- Existing Conditions
The ability of the existing roadway and its intersections to meet existing traffic demand was analyzed and described in Chapter 1. Readers wishing additional detail are referred to the Traffic Report for the Fourth Street Corridor Study (Montaño Road to Alameda Boulevard) prepared by Wilson & Company for this project. Copies of this report are available for review at the Village of Los Ranchos, NMSHTD, and FHWA. Addresses for these agencies appear at the beginning of this document.
According to the analysis, during the evening peak hours, unacceptable levels of service (LOS E or F) occur for several turning movements at the Osuna Road/4th Street intersection. Unacceptable LOS were noted for southbound left, right, and through movements at this intersection. In addition, the unsignalized intersection of 4th Street and Chavez Road also demonstrated an unacceptable LOS for the eastbound left turning movement.
Although problems were demonstrated at intersections, the 4th Street four-lane mainline operated relatively well. With current traffic volumes along 4th Street, the roadway maintained an acceptable LOS (LOS A to C) throughout the study area.
3.1.1 Traffic Operations - Impacts
Impacts to traffic operations may occur if proposed improvements would improve or worsen traffic operations at intersections or the roadway under current or future conditions.
No Build Alternative
Projected peak hour volumes were applied to existing intersection lane configurations and the 1994 Highway Capacity Manual’s capacity analyses were repeated. This analysis was conducted to determine the problems that would be expected solely due to growth in traffic volumes by the design year.
According to the analysis, additional intersection movements will fall to unacceptable LOS in the future. Unacceptable LOS were noted for the eastbound left and through, westbound right and
through, and southbound left movements at the Osuna Road/4th Street intersection and for the eastbound left, right, and through, westbound right and through movements at the El Pueblo Road/4th Street intersection; therefore, the no build alternative will produce unacceptable traffic operations at these intersections.
Despite the problems demonstrated at the study area intersections, the 4th Street four-lane mainline continued to operate well in the future. Although the LOS for 4th Street drops to D in some areas, the roadway maintained an acceptable LOS throughout the study area.
Build Alternatives
The traffic operations analyses suggested that operational deficiencies existed only at intersections within the study area. These intersections suffered an unacceptable LOS because of vehicles making turns from through lanes. This suggests that these operational deficiencies may be corrected by adding dedicated left- and right-turning lanes to these intersections.
4th Street Roadway Improvement Alternatives
Year 2020 traffic projections were identical for both the no build and the build alternatives. Although one build alternative added a two-way left-turn lane to 4th Street in the southern portion of the project area, this added lane does not appreciably increase the roadway’s capacity. Therefore, under projected year 2020 travel demand, all roadway alternatives operate at an acceptable level of service throughout the entire project area.
Character Zone 1 (Solar Road to Schulte Road)
Osuna Road/Chavez Road/4th Street Intersection Alternatives
Preferred Intersection Build Alternative - Realignment of Chavez Road to Osuna Road and Resignalization
This alternative would realign Chavez Road further north to match the existing Osuna Road alignment and would add: 1) northbound dedicated left- and right-turn lanes and a southbound dedicated left-turn lane to 4th Street; 2) dedicated left- and right-turn lanes to Osuna Road; and 3) eastbound dedicated left- and a right-through lane to Chavez Road. As a result, intersection operation improves. The traffic operations analysis established that this intersection would operate at an acceptable LOS C under future conditions; therefore, traffic operations would be improved.
Realignment of Osuna Road to Chavez Road and Resignalization
This alternative would realign Osuna Road south to match the existing Chavez Road alignment and would add: 1) northbound dedicated left- and right-turn lanes and a southbound dedicated left-turn lane to 4th Street; 2) dedicated left- and right-turn lanes to Osuna Road; and 3) eastbound dedicated left- and a right-through lane to Chavez Road. As a result, intersection operation improves. The traffic operations analysis established that this intersection would operate at an acceptable LOS C under future conditions; therefore, traffic operations would be improved.
Plaza Alternative
This alternative adds a circulation roadway between Chavez Road and the existing Northdale shopping center intersection at Osuna Road. The Chavez Road/4th street intersection will become right-out (southbound) only. As in the other alternatives, this alternative would add: 1) northbound dedicated left- and right-turn lanes and a southbound dedicated left-turn lane to 4th Street; 2) dedicated left- and right-turn lanes to Osuna Road; and 3) eastbound dedicated left- and a right-through lane to the circulation roadway. As a result, intersection operation improves. The traffic operations analysis established that this intersection would operate at an acceptable LOS C under future conditions; therefore, traffic operations would be improved.
Character Zone 2 (Schulte Road to Ranchitos Road)
Ranchitos Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This alternative would add a left-turn lane to both northbound and southbound 4th Street; however, this improvement is provided for safety benefits and doesn't appreciably improve traffic operations. The intersection operates at a LOS B with or without the improvements.
Modern Roundabout
This alternative would reconfigure the intersection to a single lane roundabout. Because of the ability of the roundabout concept to keep traffic constantly moving, the intersection improves to a LOS A; therefore, traffic operations would be improved.
Character Zone 3 (Ranchitos Road to Ortega Road)
El Pueblo Road/4th Street Intersection Alternative
Geometric Reconstruction and Resignalization
This alternative would add a dedicated left-turn lane to both northbound and southbound 4th Street and to westbound El Pueblo Road. As a result of these improvements, the intersection improves from a LOS F in the no build condition to a LOS B; therefore, traffic operations would be improved.
3.2 Land Use, Zoning, Acquisitions, and Relocations - Existing Conditions
The majority of the property along the 4th Street corridor is utilized for service or retail commercial uses. Approximately one-third of the properties along 4th Street are occupied by single or multi-family dwellings, including several mobile home parks and housing developments. The remaining property along the 4th Street corridor is vacant or used for industrial/manufacturing, wholesale or warehousing, parking, public institutions (schools), agricultural, or parks or recreation.
The majority of the property along the 4th Street corridor is privately owned with limited public ownership. Five schools are located within a mile (1.6 kilometers (km)) of 4th Street, including Taft Middle School (on Guadalupe Trail 250 feet (ft) (76 meters (m)) west of 4th Street), Los Ranchos Elementary School (adjoining 4th Street at Los Ranchos), Taylor Middle School (on Guadalupe Trail 250 ft (76 m) west of 4th Street), Alameda Elementary School (on Alameda Boulevard 300 ft (91 m) west of 4th Street), and Alvarado Elementary School (on Solar Road 4620 ft (1408 m) west of 4th Street). The Village also manages land north and south of Paseo del Norte, which is excess right of way (ROW) owned by NMSHTD.
The Village of Los Ranchos de Albuquerque adopted a Master Plan in 1992 in accordance with the desires and needs of residents, property owners, and business people within the Village as expressed through the Citizens Advisory Planning Committee, special surveys, and public hearings. The purpose of the Master Plan was to develop a vision for development within the Village by establishing a number of Village goals and policies and techniques to achieve these goals. Several of the adopted goals included: agricultural preservation, irrigation system preservation, open space preservation, vegetation and wildlife preservation, preservation of the rural nature of the Village and its roadways, and revitalization of the general Village business climate, but especially along 4th Street.
The zoning in most of the study area is determined by the Village and is primarily retail commercial with several special use, agricultural/residential, and residential zones. Bernalillo County exercises zoning jurisdiction over the unincorporated portion of the project area east of 4th Street from the Chamisal Lateral to Ortega Road and along both sides of the roadway north of Ortega Road. The zoning within this area is primarily neighborhood commercial and single family residential. The City of Albuquerque is responsible for zoning along the west side of 4th Street from Montaño Road to Camino Español and on the east side of 4th Street from Montaño Road south to Alamosa Road. The zoning within this area is primarily neighborhood commercial.
Study area residents use community facilities or senior centers outside the Village. The Nativity of the Blessed Virgin Mary Parish, located on the south side of Alameda Boulevard along the east side of 4th Street, and the Alameda Community Center and Park, located north of Alameda Boulevard east of 4th Street, provide meeting places and activities for the area.
The Bernalillo County Fire and Rescue Department and the Los Ranchos Fire Department provide fire protection to the study area and police services are provided by the Bernalillo County Sheriff’s Office. A new Bernalillo County Sheriff’s Substation on the northeast corner of La Chamisal Lane and 4th Street is nearly completed.
3.2.1 Land Use, Zoning, Acquisitions, and Relocations - Impacts
Impacts to land use or zoning may occur if proposed improvements would: 1) not conform to current land use plans or zoning ordinances; 2) result in permanent displacement of residents or users of the area through direct acquisition or changes to existing land uses (e.g. farmlands); 3) create lot sizes that do not meet liquid waste or water supply regulations; 4) result in displaced individuals unable to find comparable housing in the area; or 5) affect neighborhoods, public facilities, and families having special composition (e.g. handicapped) and which may require special considerations.
No Build Alternative
The no build alternative would not affect existing land uses, zoning, or neighborhoods within the project area and would not displace residents or businesses; however, the no build alternative would do nothing to improve the business climate within the Village and especially along 4th Street.
Build Alternatives
Encroachments into the existing roadway ROW are common throughout the project area. These encroachments may involve portions of structures, walls, fences, porches, or parking areas. In some areas, the removal of these encroachments may be necessary to construct the 4-lane roadway with shoulders and tapers alternative or to establish and maintain adequate sight distance. Removal of encroachments will follow standard NMSHTD procedures. Property owners with encroaching structures will be notified of the encroachment by letter and given a period of time to remove the encroaching structure. This letter will also offer the opportunity for a hearing if requested by the property owner. Removal of the encroaching structure will be negotiated with the property owner.
Some of these structures encroach upon the clear zone and not the roadway. Because of this, the Village may seek a design exception for clear zone width from the NMSHTD. In seeking a design exception, the Village would be required to prove that the impacted buildings would be non-hazardous to motorists based on available historical accident data and the specified clear zone from AASHTO. Should a design exception be granted, the encroaching structures would remain in place.
Table 3.1-1 summarizes the proposed ROW acquisitions by character zone and alternative. These proposed acquisitions are illustrated in Figures 3.2-1 through 3.2-9 and discussed in the following paragraphs. The total acres (hectares) to be acquired for roadway improvements listed below include ROW needed to accommodate roadway widening, curb, gutter, and sidewalks (where
Figure 3.2-1
Figure 3.2-2
Figure 3.2-3
Figure 3.2-4
Figure 3.2-5
Figure 3.2-6
Figure 3.2-7
Figure 3.2-8
Figure 3.2-9
applicable), as well as ROW needed for bus bays for transit improvements and retention facilities for stormwater system improvements. Please note that areas required for stormwater system improvements may not need to be acquired but may be utilized through easement agreements. No structures would be displaced or acquired in areas designated for stormwater retention facilities.
Table 3.1-1
Property Acquisitions Required by Character Zone and Alternative
|
Type of Improvement |
Alternative |
Acres Acquired |
Structures Acquired |
||
|
CHARACTER ZONE 1 |
|||||
|
Intersection |
Realignment of Osuna Road to Chavez Road |
1.2 acres (0.5 hectares) |
4 |
||
|
Intersection |
Realignment of Chavez Road to Osuna Road |
0.8 acres (0.3 hectares) |
0 |
||
|
Intersection |
Plaza at Chavez/Osuna |
1.0 acres (0.4 hectares) |
1 |
||
|
Roadway |
5-lane with curb, gutter, and sidewalks |
1.8 acres (0.7 hectares) 2.8 acres (1.1 hectares) easement |
0 |
||
|
CHARACTER ZONE 2 |
|||||
|
Intersection |
Geometric improvements at Ranchitos |
0.2 acres (0.1 hectares) |
0 |
||
|
Intersection |
Roundabout at Ranchitos |
0.3 acres (0.1 hectares) |
0 |
||
|
Roadway |
4-lane roadway with curb, gutter, and sidewalks |
0.8 acres (0.3 hectares) 5.3 acres (2.1 hectares) easement |
0 |
||
|
Roadway |
4-lane roadway with shoulders and tapers |
2.5 acres (1.0 hectares) 5.3 acres (2.1 hectares) easement |
0 |
||
|
CHARACTER ZONE 3 |
|||||
|
Intersection |
Geometric improvements at El Pueblo |
0.2 acres (0.1 hectares) |
0 |
||
|
Roadway |
4-lane roadway with curb, gutter, and sidewalks |
0.6 acres (0.2 hectares) 6.3 acres (2.5 hectares) easement |
0 |
||
|
Roadway |
4-lane roadway with shoulders and tapers |
1.9 acres (0.8 hectares) 6.3 acres (2.5 hectares) easement |
0 |
||
Any acquisitions and relocations of displaced residents or commercial properties will be conducted in accordance with the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as amended, including the preparation of a relocation plan. Based on current vacancy rates and costs, housing affordable to displaced residents is available within the vicinity of the project. There appear to be no special relocation considerations (handicapped individuals, etc.) that will impact this project. In addition, there appear to be adequate opportunities for the displaced businesses to remain in the project area, with the exceptions noted below, but there are no guarantees that this will occur.
Any of the build alternatives that propose installation of curb and gutter, sidewalks, and intersection lighting (all but the four-lane roadway with shoulders and tapers) conflict with the Village’s Master Plan. The Master Plan states an aversion to "…features which represent urbanization and an adverse impact upon the rural atmosphere of the area." Examples of these features specified in the Master Plan include curbs, gutters, storm sewers, sidewalks, and residential street lights. However, the Master Plan also recognizes the economic importance of 4th Street to the Village and recommends that the findings of the 4th Street Corridor Study be integrated into Village Ordinances. The Mayor of Los Ranchos and the Board of Trustees recognize these conflicts with the existing Master Plan (see letter from the Mayor in Appendix C) and have formed a Committee to revise the Plan by September 1999. Therefore, the Master Plan will be amended to allow amenities such as curb, gutter, sidewalks, stormwater drainage system, and lighting along 4th Street.
Character Zone 1 (Solar Road to Schulte Road)
Osuna Road/Chavez Road/4th Street Intersection Alternatives
Preferred Intersection Build Alternative - Realignment of Chavez Road to Osuna Road and Resignalization
The realignment of Chavez Road would require approximately 0.8 acres (0.3 hectares) of additional ROW (see Figure 3.2-2). This alternative would require no building acquisitions. This amount of ROW does not include additional ROW required on 4th Street to accommodate roadway widening and the installation of curb and gutter and sidewalks near the intersection (see roadway improvement alternative discussion below).
Realignment of Osuna Road to Chavez Road and Resignalization
The realignment of Osuna Road would require approximately 1.2 acres (0.5 hectares) of additional ROW (see Figure 3.2-1). This amount of ROW does not include additional ROW required on 4th Street to accommodate roadway widening and the installation of curb and gutter and sidewalks near the intersection. That amount is included in the total ROW and discussed below in the roadway improvement alternative section.
This alternative would require the acquisition and relocation of four structures, including, three single-family residences (330 Osuna Road, 322 Osuna Road, 318 Osuna Road) located on the south side of Osuna Road and one structure housing two commercial properties (Crown Coachworks, 336 Osuna Road and Excell Dry Cleaners, 6570 4th Street) located on the southeast corner of 4th Street/Osuna Road. Although there appear to be adequate opportunities for the displaced residences and one of the displaced businesses to remain in the project area, there are no guarantees that this will occur. However, there appears to be no suitably zoned (C2) property within the Village for relocation of the paint and body shop.
During the public involvement meetings, residents of the Chavez Road neighborhood expressed concerns that any of the alternatives that realigned the 4th Street/Osuna Road/Chavez Road would increase traffic volumes through their neighborhood. They felt that volumes would increase because vehicles would have more direct access between Rio Grande Boulevard, 4th Street, and Osuna Road. However, because additional trip origins and destinations are not created with these improvements, traffic volumes would not be expected to change substantially. The only increase in traffic that might be expected would be Chavez neighborhood residents that currently avoid Chavez Road because of the operational problems at the intersection.
Plaza Alternative
This alternative adds a circulation roadway between Chavez Road and the existing Northdale shopping center intersection at Osuna Road. The Chavez Road/4th Street intersection will become right-out (southbound) only. This alternative would acquire one business (Taco Bell, 6601 4th Street) and approximately 1.0 acres (0.4 hectares) of additional ROW from Northdale Shopping Center (see Figure 3.2-3). This amount of ROW does not include additional ROW required on 4th Street to accommodate roadway widening and the installation of curb and gutter and sidewalks near the intersection (see roadway improvement alternative discussion below).
4th Street Roadway Improvement Alternatives
Preferred Roadway Build Alternative - Five-lane roadway with raised center median, curb and gutter, and sidewalk
In this alternative, a five-lane roadway with a raised center median and curb and gutter and sidewalk along both sides would be constructed. The new section centerline would be offset approximately 8.5 ft (2.6 m) west of the existing centerline. An additional 15 ft (4.6 m) of ROW would be acquired along the west side of the roadway.
This alternative would require a total of 1.8 acres (0.7 hectares) of additional ROW (see Figure 3.2-4). Approximately 1.2 acres (0.5 hectares) of additional ROW would be needed for roadway improvements, although no buildings would be acquired. A storm water drainage system would require approximately 2.8 acres (1.1 hectares) of easements for three possible retention facilities. Transit improvements would also require 0.6 acres (0.2 hectares) of additional ROW for five new bus bays.
Character Zone 2 (Schulte Road to Ranchitos Road)
Ranchitos Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This alternative would acquire approximately 0.2 acres (0.1 hectares) of additional ROW on all sides of the intersection to accommodate roadway widening for dedicated left- and right-turn lanes from 4th Street (see Figure 3.2-5). No buildings would be acquired. This amount of ROW does not include additional ROW required on 4th Street to accommodate roadway widening and the installation of curb and gutter and sidewalks near the intersection (see roadway improvement alternative discussion below
Modern Roundabout
This alternative would acquire additional ROW on all sides of the 4th Street/Ranchitos Road intersection (see Figure 3.2-6). Approximately 0.3 acres (0.1 hectares) of additional ROW would be needed to accommodate the roundabout, curb and gutter, and sidewalks at the intersection.
The roundabout would produce a central area available for additional landscaping or art treatments. This could be used to promote a Village theme and result in greater community cohesion.
4th Street Roadway Improvements
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
The new section centerline would be offset approximately 0.5 ft (0.2 m) west of the existing centerline. An additional 1.0 ft (0.3 m) of ROW would be acquired along the west side of the roadway. This alternative would require an additional 0.8 acres (0.3 hectares) of ROW (see Figure 3.2-7). Little additional ROW would be acquired for roadway improvements in this section (0.1 acres or 0.04 hectares). No buildings would be acquired. A stormwater drainage system would require 5.3 acres (2.1 hectares) of easements for 6 possible retention facilities. Transit improvements would require 0.7 acres (0.3 hectares) of additional ROW for six new bus bays.
Four-lane roadway with shoulders and tapers
To provide the necessary clear zone through most of the project area, the new section centerline would be offset approximately 8 ft (2.4 m) west of the existing centerline. An additional 14 ft (4.2 m) of ROW would be acquired along the west side of the roadway. This alternative would require a total of 2.5 acres (1.0 hectare) of additional ROW (see Figure 3.2-7). Approximately 2.0 acres (0.8 hectares) of additional ROW would be required for roadway improvements. Improvements to stormwater drainage would require approximately 5.3 acres (2.1 hectares) of easements or right of way for 6 possible retention facilities if necessary. Transit improvements would require 0.5 acres (0.2 hectares) of additional ROW for 6 new bus bays.
This alternative requires the most ROW because of the four-lane tapered configuration and clear zone requirements. Three existing building structures, the Old Ranchos Farm building 7017 4th Street) between Pueblo Solano and Roehl Road, a building that is part of a commercial complex (7511 4th Street) located north of the Chamisal Lateral Wasteway, and the Antique Cooperative (7601 4th Street) may encroach into the footprint of this alternative. However, as discussed earlier, these buildings encroach upon the clear zone and not the actual roadway section of the alternative; therefore, a design exception shall be requested from the NMSHTD. Should a design exception be granted, the buildings would remain in place.
The four-lane roadway with shoulders and tapers has a more rural appearance than the alternatives that provide curb and gutter and sidewalk; therefore, this section would comply with the Village’s Master Plan. No revisions to the Master Plan would be required with the construction of this section in either Character Zone 2 or 3.
Character Zone 3 (Ranchitos Road to Ortega Road)
El Pueblo Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This alternative would acquire approximately 0.2 acres (0.1 hectares) of additional ROW at the intersection to accommodate roadway widening for dedicated turn lanes on El Pueblo Road and to accommodate installation of curb and gutter and sidewalks at the intersection. No buildings would be acquired (see Figure 3.2-8).
4th Street Roadway Improvements
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
The new section centerline would be offset approximately 0.5 ft (0.2 m) west of the existing centerline. An additional 1.0 ft (0.3 m) of ROW would be acquired along the west side of the roadway. This alternative will require 0.6 acres (0.2 hectares) of additional ROW (see Figure 3.2-9). Little additional ROW would be acquired for roadway improvements in this section (0.1 acres or 0.04 hectares). No buildings would be acquired. A stormwater drainage system would require approximately 6.3 acres (2.5 hectares) of easements for 7 possible retention facilities. Of the 6.3 acres, 3.3 acres (1.3 hectares) may be acquired for two retention facilities located north of Paseo de Norte on both the east and west sides of 4th Street. Transit improvements would require 0.5 acres (0.2 hectares) of additional ROW for four new bus bays.
Four-lane roadway with shoulders and tapers
To provide the necessary clear zone through most of the project area, the new section centerline would be offset approximately 8 ft (2.4 m) west of the existing centerline. An additional 14 ft (4.2 m) of ROW would be acquired along the west side of the roadway. This alternative will require 1.9 acres (0.8 hectares) of additional ROW. Approximately 1.6 acres (0.6 hectares) of additional ROW will be required for roadway improvements. Improvements to stormwater drainage would require approximately 6.3 acres (2.5 hectares) of easements for 7 possible retention facilities if necessary. Of the 6.3 acres, 3.3 (1.3 hectares) may be acquired for two retention facilities located north of Paseo de Norte on both sides of 4th Street. Transit improvements would require 0.3 acres (0.1 hectares) of additional ROW for four new bus bays.
Two existing buildings, David Montoya Construction Company on the southwest corner of Ortega Road and 4th Street (8831 4th Street) and a residence (8747 4th Street) located north of Paseo del Norte, may encroach into the footprint of this alternative. However, as discussed earlier, these buildings encroach upon the clear zone and not the actual roadway section of the alternative; therefore, a design exception for clear zone width shall be requested from the NMSHTD. Should a design exception be granted, the buildings would remain in place.
3.3 Socioeconomics - Existing Conditions
The study area is contained within the Village of Los Ranchos de Albuquerque, Bernalillo County, and City of Albuquerque census tracts 35.01, 35.02, and 36.00. Tract 35.01 is situated between 4th Street and Edith Boulevard and between Paseo del Norte and Montaño Road. Tract 35.02 extends west of 4th Street to the Rio Grande and is also situated between Paseo del Norte and Montaño Road. Tract 36.00 extends north of Paseo del Norte to the Bernalillo/Sandoval County line and between Rio Grande and Edith Boulevard. The census tracts are shown in Figure 3.3-1.
A comparison of selected census information from each of these tracts with the same information for the City of Albuquerque and Bernalillo County is presented in Table 3.3-1. As shown in Table 3.3-1, a population of greater Hispanic origin than the general county or city population characterizes Tracts 35.01 and 36.00 (56 and 52 percent, respectively, compared to 34 and 37 percent for the city and the county, respectively). However, these tracts do not appear to be economically disadvantaged. The median family incomes in 1989 for Tracts 35.01, 35.02, and 36.00 are $21,667, $35,341, and $24, 545, respectively. Tracts 35.02 and 36.00 have slightly fewer persons below the poverty level than the city or county.
All three tracts have a greater percentage of owner-occupied housing than the city and county and the owner-occupied housing in Tracts 35.02 and 36.00 is generally of greater value than that of both the city and county. In Tract 35.02 and in Tract 36.00, 36 percent and 25 percent, respectively, of the houses are valued greater than $150,000, compared to 10 percent and 11 percent for the city and county, respectively. All three tracts have a higher percentage of housing constructed prior to 1960 than both the city and county; therefore this is an older, well-established area.
Table 3.3-1
Selected Study Area, City of Albuquerque, and Bernalillo County Census Information
|
POPULATION CHARACTERISTICS |
City of Albuquerque |
Bernalillo County |
Census Tract 35.01 |
Census Tract 35.02 |
Census Tract 36.00 |
|
1990 Population |
384,736 |
480,577 |
5169 |
5065 |
6635 |
|
Total Families |
99,507 |
124,794 |
1330 |
1400 |
1794 |
|
Total Households |
153,818 |
185,582 |
1872 |
1892 |
2301 |
|
RACE CHARACTERISTICS |
|||||
|
Total Persons of Hispanic Origin |
132,706 |
178,310 |
2916 |
1767 |
3447 |
|
% Persons of Hispanic Origin |
34% |
37% |
56% |
35% |
52% |
|
ECONOMIC CHARACTERISTICS |
|||||
|
Median Family Income (1989) |
$21,667 |
$35,341 |
$24,545 |
||
|
Persons Below Poverty Level |
52903 |
68845 |
792 |
503 |
799 |
|
% Persons Below Poverty Level |
14% |
14% |
15% |
10% |
12% |
|
HOUSING CHARACTERISTICS |
|||||
|
1990 Housing Units |
166870 |
201235 |
1978 |
2011 |
2468 |
|
% Change |
N/A |
24% |
11% |
3% |
17% |
|
Owner Occupied |
62% |
65% |
72% |
81% |
84% |
|
Housing Value Under $30,000 |
1% |
2% |
3% |
1% |
4% |
|
Housing Value $30,000-60,000 |
14% |
15% |
20% |
10% |
11% |
|
Housing Value $60,000-150,000 |
75% |
71% |
70% |
52% |
61% |
|
Housing Value $150,000 or higher |
10% |
11% |
6% |
36% |
25% |
|
Structure Built 1980 and after |
19% |
20% |
17% |
11% |
26% |
|
Structure Built 1970-1979 |
22% |
21% |
17% |
20% |
23% |
|
Structure Built 1960 or earlier |
47% |
47% |
66% |
69% |
50% |
Figure 3.3-1
3.3.1 Socioeconomics - Impacts
Social and economic impacts may result if the proposed improvements: 1) produce changes in neighborhood or community cohesion; 2) produce changes in travel patterns and accessibility; 3) affect roadway and traffic safety or overall public safety; 4) specially benefit or harm social groups (e.g. elderly); 5) cause economic effects on the regional and/or local economy ( e.g. tax revenues); 6) affect the economic viability of existing roadway-related businesses; or 7) disrupt or substantially change existing economic patterns.
No Build Alternative
The no build alternative would allow the downward socioeconomic trend along 4th Street to continue. The economic, safety, and accessibility benefits that will result from project implementation, will not be realized under the no build scenario.
Build Alternatives
All build alternatives will produce intersection improvements and improved safety. According to the Institute of Transportation Engineers' 1993 Traffic Safety Toolbox, channeling left-turns at signalized intersections may be expected to reduce accidents by 15 percent and at unsignalized intersections by 30 percent without a raised median separation.
The installation of curb and gutter, sidewalks, and intersection lighting in the urban section alternatives may serve to stimulate economic development of the area and may also serve to promote greater community cohesion. This could occur by encouraging area residents to walk to local destinations thereby promoting greater opportunities for interaction among Village residents.
The construction phase of the project may result in some temporary inconvenience for businesses and residents of the project area. Construction activities for the roadway and utilities may produce short-term interruptions to driveway and pedestrian access. As a result, some short-term loss of patronage to project area businesses may occur. A traffic control plan that will ensure continued assess to businesses and residences will minimize construction effects to businesses and residents. Improved safety, drainage, and traffic operations of the roadway and improved pedestrian access after construction is complete will offset any temporary inconvenience to the area.
Bernalillo County may experience a loss of tax revenues from the build alternatives. ROW acquisition will remove land from the County’s tax roles. However, most of the land acquired for the build alternatives is of relatively little tax value. Therefore, the loss to the County will be more than offset by the economic stimulation resulting from project construction.
As discussed in the previous section, several businesses may be acquired for construction of certain build alternatives. As a result, the gross receipts taxes paid to the Village by these businesses may be lost. Although adequate opportunities may exist for these businesses (with the exception of Crown Coachworks, 336 Osuna Road) to relocate within the Village limits, there are no assurances that this will occur.
The project would have a positive, temporary effect on local employment resulting from jobs associated with project construction. According to estimates by the FHWA, approximately 10 on-site jobs are created for every $1,000,000 spent in highway construction costs; therefore, this project may create approximately 10 on-site jobs, depending on the alternative selected. In addition, indirect benefits would also be provided to local businesses that supply construction materials and other goods and services.
According to Executive Order 12898 on Environmental Justice, no federal action shall have disproportionately high and adverse human health or environmental effects upon minority and low income populations. No disproportionate impacts to minority, ethnic, or economic groups are anticipated as a result of any of the build alternatives. The proposed alternatives would not permanently disrupt any existing or proposed neighborhood, or adversely affect community cohesion. In fact, pedestrian enhancements and the use of common Village themes in the construction of improvements may result in improved community cohesion.
To facilitate the orderly movement of traffic entering and exiting 4th Street and improve overall roadway safety, access to abutting properties will be controlled. As an element of the design of improvements to 4th Street, access points will be consolidated where possible and shared access drives will be considered where practical. The final driveway access scheme may be modified to comply with the NMSHTD’s Regulations for Driveways and Median Openings on Non-Access Controlled Highways (SHTD Rule 89-1(L)). The modifications will be determined during final design and after the property owner interviews are conducted. Although residences and businesses will not lose access to 4th Street, access modifications may result in inconveniences to residents or businesses in the area.
Proposed pedestrian facilities enhancements may result in improved community cohesion. All intersection alternatives will upgrade intersections and sidewalks within the project limits to be in compliance with the Americans with Disabilities Act (ADA) requirements. These improvements will provide enhanced access to those with mobility impairments and will generally improve accessibility for pedestrians in the area.
Taft Middle School’s Side-by-Side program for handicapped students will especially benefit from the proposed improvements (see Section 3.15). The Side-by-Side program uses frequent field trips to businesses in the 4th Street area to teach life responsibilities to the students. ADA compliant improvements to the roadway and especially to the intersection of Solar Drive/4th Street will allow wheelchairs to utilize sidewalks and provide positive separation from motor vehicles.
Removal of business parking along 4th Street is problematic. According to the Village of Los Ranchos Zoning Ordinance, all parking spaces required for commercial parking shall be located on the same site as the building; therefore, remote parking or shared parking is a violation of the zoning code. However, the Master Plan also recognizes the economic importance of 4th Street to the Village and recommends that the findings of the 4th Street Corridor Study be integrated into Village Ordinances. On November 18, 1998, the Board of Trustees of the Village of Los Ranchos de Albuquerque passed a resolution (see Appendix C) supporting the recommendations of the Detailed Analysis of Alternatives Report for the 4th Street Corridor Study that are being analyzed in this EA. If the build alternatives that require replacement parking are selected, the Zoning Ordinance will be amended to reflect the desirability of shared and off-site parking along 4th Street.
The amount of parking lost and/or displaced by character zone is discussed in detail by alternative below. Parking spaces were considered lost when replacement space was unavailable elsewhere on the premises and displaced when there appeared to be replacement space available on the premises.
Character Zone 1 (Solar Road to Schulte Road)
Osuna Road/Chavez Road/4th Street Intersection Alternatives
Access modification to local residences and businesses would occur in all intersection alternatives. The existing primary access to the Northdale Shopping Center from 4th Street would be closed and access would be gained through a new entrance to the north.
All three build alternatives at the intersection of Osuna Road/Chavez Road/4th Street would result in improved intersection safety. The provision of dedicated turning lanes at the intersection will remove turning vehicles from the through traffic streams and will result in fewer rear end accidents. In addition, the provision of pedestrian facilities at the intersections with curbs that effectively separate pedestrian and vehicles will increase safety for pedestrians near the intersection.
Preferred Intersection Build Alternative - Realignment of Chavez Road to Osuna Road and Resignalization
This alternative requires no commercial property acquisition; therefore, no gross receipts tax revenues would be lost to the Village. No permanent loss of parking would occur in this alternative, but an estimated 25 parking spaces would be displaced within Northdale Shopping Center. This alternative would also effectively separate the southern one-eighth of the property in the Shopping Center from the remainder, making pedestrian access from the Taco Bell to the remainder of the shopping center more difficult; however, with the closure of the existing Chavez Road/4th Street intersection, it may be possible to vacate the existing Chavez Road ROW in this area and offer it in trade to Northdale as replacement parking or for other uses. Negotiations with the property owner will occur as final design of this alternative occurs.
Realignment of Osuna Road to Chavez Road and Resignalization
This alternative would require the acquisition of two commercial properties (Crown Coachworks, 336 Osuna NW and Excell Dry Cleaners, 6570 4th NW) on the southeast corner of 4th Street/Osuna Road. As a result, gross receipts tax revenues from these businesses may be lost to the Village. These businesses and its employees may relocate; however, there are no guarantees that the businesses will relocate within the study area, and, if not, the jobs provided by these businesses may be lost to the area. According to the owner of Crown Coachworks, suitable property zoned for this commercial use (C-2) is not currently available within the Village; therefore, this business is likely to relocate outside the Village limits.
No permanent loss of parking would occur in this alternative, but approximately 25 parking spaces would be displaced by this alternative on both the east and west sides of 4th Street. Businesses with parking affected by this alternative appear to have sufficient replacement parking space available; however, replacement parking will be negotiated with the property owners during final project design.
Plaza Alternative
This alternative requires the acquisition of one commercial property in the Northdale Shopping Center (Taco Bell, 6601 4th Street); therefore, the gross receipts tax revenues generated by this business may be lost to the Village. This business and its employees will relocate; however, there are no guarantees that the businesses will relocate within the study area, and, if not, the jobs provided by these businesses may be lost to the area.
The existing primary access to the Northdale Shopping Center from 4th Street would be closed and access would be gained through a new entrance to the north and in the northwest corner of the circulation roadway.
This alternative would displace an estimated 30 parking spaces on both the east and west sides of 4th Street. It appears that the businesses have sufficient lot space to reconfigure parking and not decrease the number of available parking spaces on their property. Approximately 10-11 parallel parking spaces along Chavez Road would be created in the design of the plaza alternative; however, replacement parking will be negotiated with the property owners during final project design.
The plaza created in the center of the new circulation roadway would produce an area available for additional landscaping or art treatments. This area could be used to promote a Village theme or produce a Village entryway and result in greater community cohesion.
4th Street Roadway Improvement Alternatives
Preferred Roadway Build Alternative - Five-lane roadway with raised center median, curb and gutter, and sidewalk
This alternative would require no commercial building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village.
This alternative will offset the roadway 8.5 ft (2.6 m) to the west and will require an additional 15 ft (4.6 m) of ROW along the west side of the roadway. This will move the roadway closer to the businesses along the west side of 4th Street and may require businesses with parking adjacent to 4th Street to reconfigure parking areas. Approximately 85 parking spaces would be displaced by this alternative on both the east and west sides of 4th Street. It appears that these businesses have sufficient replacement space on the premises. However, approximately 18 parking spaces at two businesses (Gemini Fireworks, 6525 4th Street, and PPMSA Photo Service, 6519 4th Street) along the west side of 4th Street would be lost (see Figure 3.3-2). These parking spaces are adjacent to 4th Street and the businesses have no space to replace the lost parking on their property. Space for replacement parking is available on the vacant lot to the north across Sandia View Road; however, this would require the customer to cross Sandia View Road to gain access to the businesses. Customers of PPMSA Photo Service would be required to walk over 200 ft (61 m) to get to this business. Use of this off-site parking would violate the Village’s existing zoning ordinance; however, the Village recognizes the conflicts within the current Zoning Ordinance; and will amend the ordinance to allow shared and off-site parking along 4th Street. Negotiations with property owners will occur as final design of the improvements proceeds. The impacts to these businesses are summarized in Table 3.3-2 below.
Table 3.3-2
Parking Spaces Lost in Five-lane Roadway, Character Zone 1
|
Address |
Name |
# Spaces Lost |
Total # Spaces Available |
% Total Spaces Lost |
% Total Spaces Lost after Replacement Space Utilized |
|
6525 |
Gemini Fireworks |
12 |
16 |
75% |
0% |
|
6519 |
PPMSA Photo Service |
6 |
10 |
60% |
0% |
Character Zone 2 (Schulte Road to Ranchitos Road)
Ranchitos Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This alternative would require no commercial building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village. It appears that approximately 10 parking spaces at the shopping center on the northwest corner of 4th Street and Ranchitos Road would be displaced by this alternative; however, replacement parking will be negotiated with the property owners during final project design.
Modern Roundabout
This alternative would require no commercial building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village. Approximately 6 parking spaces at the shopping center on the northwest corner of 4th Street and Ranchitos Road would be displaced by this alternative. Approximately 7 parking spaces on the southwest corner of the intersection (Norwest Bank, 7827 4th NW) would be lost (see Figure 3.3-3). Eighteen total parking spaces are currently provided at this business. The loss of 7 parking spaces constitutes a loss of 39 percentage of available parking. These parking spaces are directly adjacent to Ranchitos Road and it appears there is limited additional space available to replace the lost parking spaces on the existing property. However, space for replacement parking is available on a vacant lot to the west. Use of this off-site parking would violate the Village’s existing zoning ordinance; however, the Village recognizes the conflicts within the current Zoning Ordinance; and will amend the ordinance to Figure 3.3-2
Figure 3.3-3
allow shared and off-site parking along 4th Street. Negotiations with property owners will occur as final design of the improvements proceeds.
In addition to the loss of parking, egress from the Norwest Bank may be modified. Currently, traffic exiting the drive-up banking window at the Bank can turn northbound or southbound onto 4th Street. With the proposed roundabout configuration at this intersection, traffic exiting the Bank’s drive-up will be limited to a right turn (southbound) onto 4th Street.
The roundabout would produce a central area available for additional landscaping or art treatments. This could be used in conjunction with improvements in the southern project area to produce a continuous Village theme and result in greater community cohesion.
4th Street Roadway Improvements
Four-lane roadway with curb and gutter and sidewalk
This alternative would require no commercial building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village. Access modification to local residences and businesses would occur. Although residences and businesses will not lose access to 4th Street, access modifications may result in inconveniences to residents or businesses in the area.
Four-lane roadway with shoulders and tapers
This alternative will offset the roadway 8 ft (2.4 m) to the west and will require an additional 14 ft (4.2 m) of ROW. This will move the roadway closer to the businesses along the west side of 4th Street. Approximately 52 parking spaces would be displaced by this alternative on the west side of 4th Street. These businesses have sufficient space to reconfigure parking and not lose parking spaces; however, replacement parking will be negotiated with the property owners during final project design.
This alternative would result in the greatest amount of parking loss. Approximately 58 parking spaces along the west side of 4th Street would be lost (see Figure 3.3-4). These parking spaces are adjacent to 4th Street and businesses have little space to replace the lost parking on their property without extensive property modification. Space is available south of the Los Rancho Plaza (along the north side of Schulte Road) for parallel and angle parking that will accommodate the 15 spaces lost in front of the Plaza, but use of property in front of a residence would be required. Nine parallel parking spaces would be available in front of the strip shopping center on the northwest corner of Green Valley Road and 4th Street. Replacement for the remaining parking spaces is available in the rear of the shopping center. This would require extensive property modification and perhaps some additional property acquisition along the western property boundary. Additionally, customers would be required to park behind buildings with building entrances on the front. This would result in an inconvenience to shoppers. Replacement parking will be negotiated with the property owners during final project design.
Family Barber Center and Green Valley Meats would be required to seek shared parking with an adjacent business since it appears that replacement parking is not available on these sites. Replacement parking areas are available on north and west of the strip shopping center on the southwest corner of Tyler Road and 4th Street. Parking of the west side of the center would require property modification and perhaps some additional property acquisition along the western property boundary. Use of this off-site parking would violate the Village’s existing zoning ordinance; however, the Village recognizes the conflicts within the current Zoning Ordinance; and will amend the ordinance to allow shared and off-site parking along 4th Street. Negotiations with property owners will occur as final design of the improvements proceeds. The loss of parking is summarized in Table 3.3-3 below.
Figure 3.3-4
Table 3.3-3
Parking Spaces Lost in Four-lane Roadway with Shoulders and Tapers Alternative, Character Zone 2
|
Address |
Name |
# Spaces Lost |
Total # Spaces Available |
% Total Spaces Lost |
% Total Spaces Lost after Replacement Space Utilized |
|
6701; 6705; 6709; 6711 |
Los Ranchos Plaza: businesses that front 4th Street: include 6701-Mobile Vacuum; 6705-Valley Garden Florist; 6709-Accent Pet Styling School; 6711-Albq. Finance Credit
|
15 |
42 |
36% |
0% |
|
6801; 6805; 6807; 6809; 6811; 6817 |
Strip Shopping Center (NW corner of Green Valley & 4th): includes 6801-Village Framers; 6805-H&H Bldg; 6807-vacant; 6509-Custom Upholstery; 6811-Johnny's Auto Svc; 6817-Brother's Plating |
27 |
35 |
77% |
0% |
|
6835 |
Family Barber Center |
2 |
2 |
100% |
100% |
|
6839 |
Green Valley Meats |
3 |
7 |
43% |
43% |
|
6841; 6843; 6845; 6847 |
Strip Shopping Center (SW corner of Tyler & 4th): includes 6841/6843-El Paisano Ed. Resources Center; 6845-Unidentified; 6847-Saddle Up Jerky |
11 |
11 |
100% |
0% |
Character Zone 3 (Ranchitos Road to Ortega Road)
El Pueblo Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This alternative would require no commercial or residential building acquisitions; therefore, no gross receipts tax revenues generated would be lost to the Village. No parking would be lost or displaced by this alternative.
4th Street Roadway Improvements
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
This alternative would require no commercial or residential building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village. No parking would be lost or displaced by this alternative.
Access modification to local residences and businesses would occur. Although residences and businesses will not lose access to 4th Street, access modifications may result in inconveniences to residents or businesses in the area.
Four-lane roadway with shoulders and tapers
This alternative would require no commercial or residential building acquisitions; therefore, no gross receipts tax revenues would be lost to the Village. This alternative will offset the roadway 8 ft (2.4 m) to the west and will require an additional 14 ft (4.2 m) of ROW. This will move the roadway closer to the businesses along the west side of 4th Street. Although no parking would be lost, 6 parking spaces would be displaced by this alternative; therefore, replacement parking will be negotiated with the property owners during final project design.
3.4 Agricultural Lands and Conditions Irrigation Systems - Existing
There are several areas classified by the National Resources Conservation Service (NRCS) as Important Farmland or Farmland of Statewide Importance within one mile of 4th Street, but none in the immediate project area. These areas are separated from 4th Street by barriers that will not be crossed during the proposed 4th Street improvements, such as 2nd Street, irrigation channels, and laterals. The following areas are identified as Important Farmland on the NRCS map for Bernalillo County, New Mexico:
According to the Village of Los Ranchos de Albuquerque’s Comprehensive Zoning Ordinance, agricultural activities are defined as, "The tilling of the soil, the raising of crops, horticulture, and animal husbandry". There are approximately 10 areas along the 4th Street study corridor which could be used for these purposes; however, only a few pockets are zoned for special or agricultural use. According to the Master Plan, agriculture is considered to be the "highest and best" use of the land in the area and the key to the rural atmosphere of the Village. It is the Village’s policy to encourage the preservation of agricultural land wherever and whenever possible.
To support agricultural activities and the accompanying need for irrigation water in the area, the Middle Rio Grande Conservancy District (MRGCD) owns and operates a network of irrigation and drainage canals in the area (see Figure 3.4-1 through 3.4-3). Four MRGCD irrigation ditches cross the 4th Street corridor between Alameda Boulevard and Montaño Road (Gallegos Lateral - south of Vineyard Road, Chamisal Lateral Wasteway - 660 ft (201 m) south of Ranchitos Road, Chamisal Lateral - Sarah Lane, and Derramadera Ditch - St. Francis Road). All of these ditches cross within the project area. In addition to those owned by MRGCD, several smaller irrigation ditches are privately owned and maintained. Five of these privately-owned ditches are located within the project area. According to the Master Plan, the Village’s irrigation and drain system is considered a vital component of the unique character of the area. Ditches are used for irrigation, support of vegetation, and support of water table levels.
3.4.1 Agricultural Lands and Irrigation Systems - Impacts
Impacts to farmland may occur if prime, unique, or farmlands of state or local importance are rendered unusable or unprofitable for agricultural operations. The Farmland Protection Policy Act (7 USC 4201-4209, 1981) requires that the loss of prime or important farmland be avoided or mitigated to minimize impacts.
No Build Alternative
The no build alternative will have no effects on agricultural lands in the project area.
Build Alternatives
Although prime or important farmland exists within the study area, this land is separated from the project area by a minimum of 0.25 miles (0.4 km); therefore, the build alternatives will have no effects on agricultural lands in the project area. Although the siphons at each of the irrigation crossings would be replaced, the canals will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Licenses would be required from the MRGCD for this work.
3.5 Cultural and Archeological Resources - Existing Conditions
A records search and field survey was conducted to ensure compliance with the National Historic Preservation Act of 1969, as amended, the Cultural Properties Act, and the New Mexico Prehistoric
Figure 3.4-1
Figure 3.4-2
Figure 3.4-3
and Historic Sites Preservation Act to ensure the identification and evaluation of any cultural or archeological resources within the project area.
A preliminary cultural resource records search and Class I evaluation of the project involved a review of the New Mexico Cultural Resource Information System (NMCRIS) files and identified all cultural resources within 0.5 miles of the project. A review of the New Mexico State Register of Cultural Properties and the National Register of Historic Places was also completed searching for all registered properties within 0.5 miles of the project area. Additional research included consultation with a variety of historic documents and maps, archeological and historical settlements, historic roads, and irrigation canals.
A total of 15 cultural resources were recorded within 0.5 miles of the proposed project, including the important prehistoric-early historic pueblos of Alameda (LA 421) and Chamisal (LA 22765); however, no cultural resources have been previously identified within the project area. Six properties listed on the State and National historic registers are located within 0.5 miles of the project, but only one, the Juan Chavez House (HPD 936), is adjacent to 4th Street.
The portion of 4th Street within the project area is of historic interest. The road was first graded in 1910 and was incorporated into El Camino Real - New Mexico 1, which was the first major highway development in New Mexico. From 1926 to 1937, the road was part of the U.S. 66 highway system and saw considerable traffic and related development associated within this use. With the realignment of U.S. 66, in 1937, this northern portion of 4th Street was incorporated into the U.S. 85 highway system. The road was first paved in 1922, and sections of the concrete roadbed associated with the U.S. 85 construction are apparently still intact below the existing roadbed; however, most of the roadway and associated buildings and structures have seen considerable modifications and renovation in recent years. The original roadbed has been removed just north of the project area as a part of another project. There are probably isolated buildings along the project area that qualify for National Register nomination under the thematic canopy of "Historic and Architectural Resources of the Route 66 Thoroughfare in New Mexico" (Kammer 1993) or "Auto-oriented Commercial Development in Albuquerque, New Mexico, 1916-1956" (Wilson 1996). However, the project area does not qualify for district nomination under these thematic nominations and the roadbed itself does not have the historic integrity to justify preservation or mitigative treatment.
Three major irrigation canals and two secondary canals (one abandoned) cross 4th Street within the study area. Many of the canals and all of the drains in the Albuquerque area were built following the Middle Rio Grande Reclamation Project in the late 1920s and 1930s. The older pre-reclamation canals (i.e., Chamisal, Deramadera, and Los Griegos) in the Los Ranchos area were extensively modified during this period. Improvements of these canals have continued in modern times and most of the gates and turn-out structures along the canal are of modern construction.
A field survey was conducted for this project and included the existing roadway ROW, 15 ft (4.6 m) west of the existing ROW; and 18 locations where stormwater retention facilities were to be located. This survey did not uncover cultural resources that were likely to yield important information on local history. A number of cultural localities were also found in the project area, including a highway accident memorial marker, secondary irrigation canals, sign posts, and a middle 20th century house foundation; however, these localities are considered unlikely to yield important information on local history and no further research or mitigative treatment is recommended.
3.5.1 Cultural and Archeological Resources - Impacts
Impacts to cultural or archeological resources may occur if the project results in: 1) damage to archeological or cultural remains expected to yield important information on local history; 2) prevention of recovering information from remains expected to yield important information on local history; 3) damage, demolition, or disturbance to the setting of historic structures; or 4) interference with the usage of a historic site.
No Build Alternative
The no-build alternative would not affect existing cultural and archeological resources within the project area.
Build Alternatives
Canal siphon-culverts under 4th Street will be removed and new siphon structures and headgates will be constructed with any of the build alternatives. The specific structural features of the canals in the project area are of modern construction (built between 1950 and 1960) and are not considered of historic value. Although the siphons may be replaced, the canals will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, the project development will have no effect on the historic integrity of these canal systems.
No cultural resources were identified within the proposed project area that require further research or treatment. The records search and archeological survey suggest that no cultural historical resources will be directly affected by the project. The New Mexico Historic Preservation Division has concurred that the project will have no adverse effect on properties included in or eligible for inclusion in the National Register of Historic Places. No additional investigations are recommended. A copy of this correspondence is included in Appendix D.
There is, on any project, a possibility that buried cultural remains occur within the fluvial environmental of the study area or are concealed by modern developments. Clearly, much of the area has been disturbed by previous road construction and the placement of utilities below the road. However, there is a possibility that intact, but buried, cultural remains are present. Because of this, it is recommended that archeological monitoring of the project be completed, at intervals, during excavations in excess of 3 ft (1 m). If cultural resources are found, the NMSHTD and the State Historic Preservation Officer will be notified.
Character Zone 1 (Solar Road to Schulte Road)
Osuna Road/Chavez Road/4th Street Intersection Alternatives
Preferred Intersection Build Alternative - Realignment of Chavez Road to Osuna Road and Resignalization
This intersection alternative will not impact any known cultural resources and no further research or mitigation treatment is recommended.
Realignment of Osuna Road to Chavez Road and Resignalization
This alternative would require the acquisition of four buildings. The buildings include three single-family residences (330 Osuna Road, 322 Osuna Road, and 318 Osuna Road) and one commercial structure that contains two businesses (336 Osuna Road and 6570 4th Street). The residences were construction circa 1950. The commercial building was constructed in 1965. The structures have been photographed and are described on New Mexico Historic Buildings Inventory forms. None of these buildings appear to have historic value; therefore, this intersection alternative will not impact any known cultural resources and no further research or mitigation treatment is recommended.
Plaza Alternative
This alternative would require the acquisition of one commercial building (Taco Bell, 6601 4th Street). The structure has been photographed and is described on a New Mexico Historic Buildings Inventory form. This building was constructed sometime between 1985-1990 and has no historic value; therefore, this intersection alternative will not impact any known cultural resources and no further research or mitigation treatment is recommended.
4th Street Roadway Improvement Alternatives
Preferred Roadway Build Alternative - Five-lane roadway with raised center median, curb and gutter, and sidewalk
Three cultural localities were recorded during the archeological survey in Character Zone 1. Remnants of an abandoned secondary irrigation canal were found at 6313 4th Street. The concrete headers for the siphon or culvert structure are visible but no evidence of the culvert under the road can be seen. The MRGCD’s Gallegos Irrigation Canal in the project vicinity is an earth-banked ditch that crosses under 4th Street in a buried pipe approximately 98 ft (30 m) south of the intersection of 4th Street and Solar Road. The canal is exposed about 165 ft (50 m) to the west of 4th Street. Although the siphons may be replaced, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, project development will have no effect on the historic integrity of the canal system.
The remains of a 20th century house foundation approximately 300 ft (100 m) north of the junction of Solar Road and 4th Street, approximately 16 ft (5 m) east of 4th Street. The concrete foundation measures approximately 16 ft (5 m) by 23 ft (7 m) in size. No evidence of the house walls or superstructure remain. Cultural materials in the area include clear bottle glass, plastic pipe, ceramic pipe, metal pipe, bricks, and concrete. The remains have no historic value and do not warrant inclusion into the New Mexico Cultural Resources Information System files. No further research or treatment of this structure is recommended.
Roadway and drainage improvements in this alternative and in the four-lane roadway with curb and gutter and sidewalk alternatives in Character Zones 2 and 3 will require the removal of the concrete slab under the existing roadway. This concrete slab is associated with early roadway construction; however, the roadway has seen considerable modification and renovation and the roadbed does not have the historic integrity to justify preservation or mitigation treatment.
Character Zone 2 (Schulte Road to Ranchitos Road)
Ranchitos Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization and Modern Roundabout
One cultural locality, a secondary canal of the Chamisal Lateral System directly south of the Ranchitos Road and 4th Street intersection, was noted in this area. The canal siphon-culverts associated with this canal may be removed and new siphon structures and headgates will be constructed if necessary; however, the specific structural features of the canals were built between 1950 and 1960 and are not of historic value. Although the siphons may be replaced, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, project development will have no effect on the historic integrity of the canal system.
4th Street Roadway Improvements
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
The Juan Chavez House (HPD 936), is situated on the west side of 4th Street and south of Ranchitos Road; however, this property will not be affected by any of the proposed improvements.
Three cultural localities were recorded during the archeological survey within Character Zone 2, including the secondary canal of the Chamisal Lateral System that was described earlier, two masonry block sign posts signifying the entrance to a historical subdivision, and the Chamisal Lateral wasteway irrigation canal. The masonry block sign posts and low masonry walls are located along the west side of 4th Street at the entrance to the Pueblo Solano subdivision. The sign posts and walls are the entrance to this historic subdivision that was built in 1940. The sign posts consist of cut-sandstone block pylons about 5 ft (1.50 m) high and 17 inches (50 cm) square. The pylons are set on concrete pediments. The south pylon is marked "Pueblo" and the north pylon is marked "Solano." This minor cultural feature does not justify inclusion in the NMCRIS system or require further research or mitigative treatment.
The MRGCD’s Chamisal Lateral Wasteway crosses 4th Street approximately 740 ft (225 m) south of Los Ranchos Road. This canal was constructed during the late 1930s to carry overloads and to supply additional water to the El Pueblo Canal and was probably rebuilt when the roadway was widened from two to four lanes in the 1950s. The canal crosses under 4th Street in a siphon-culvert structure with concrete headers and existing walls. Although the siphons may be replaced, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, the project development will have no effect on the historic integrity of this canal system.
This build alternative will have no adverse effect on properties included in or eligible for inclusion in the National Register of Historic Places.
Four-lane roadway with shoulders and tapers
This alternative will affect the cultural features described above differently than the four-lane roadway with curb and gutter and sidewalk alternative; however, this alternative will not affect properties of historic value. Selection of this alternative will not require removal of the early roadway concrete slab under the existing roadway; however, this alternative requires the roadway to be offset approximately 8.0 ft (2.4 m) west of the existing centerline. As a result, the subdivision sign posts may need to be moved outside the clear zone. The Juan Chavez House (HPD 936) will not be affected by construction of this alternative.
This alternative will also reconstruct the siphons of the Chamisal Lateral Wasteway; however, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, the project development will have no effect on the historic integrity of this canal system.
Character Zone 3 (Ranchitos Road to Ortega Road)
El Pueblo Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
This intersection alternative will not affect existing cultural and archeological resources within the project area.
4th Street Roadway Improvements
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
Two minor cultural localities were recorded within Character Zone 3 during the archeological survey. One of these was a white-painted wooden cross inscribed with, "Ricky Lucero, Born 11/4/70, Died 12/23/93" (located on the west side of 4th Street on the north ramp of the Paseo del Norte overpass). Another small wooden cross is also located at this site and both crosses are decorated with artificial flowers. These crosses are located within 4th Street ROW and may be removed by this alternative.
The other minor cultural locality is part of MRGCD’s Chamisal Lateral that crosses 4th Street approximately 740 ft (225 m) north of Ranchitos Road. This lateral may represent a part of the old Los Ranchos Ditch. A survey of the ditch in 1910, indicated that it was an old canal constructed prior to 1800; however, the concrete siphon-culvert structure that crosses 4th Street was probably built when 4th Street was widened from a two-lane to a four-lane highway in the 1950s. Although the siphons may be replaced, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, the project development will have no effect on the historic integrity of this canal system.
Four-lane roadway with shoulders and tapers
Selection of this alternative will not require removal of the early roadway concrete slab under the existing roadway; however, this alternative will also require removal of the highway accident memorial markers. This alternative will also reconstruct the siphons of the Chamisal Lateral Wasteway; however, the canal will continue to function as originally designed and irrigation waters will not be impaired or restricted as a result of the construction. Therefore, the project development will have no effect on the historic integrity of this canal system.
3.6 Water Quality and Drainage - Existing Conditions
Natural drainage in the area is provided by the Rio Grande River, although the natural drainage patterns of the area have been modified by irrigation of agricultural land and commercial and residential development. According to groundwater contamination remediation reports within the project area, groundwater is encountered between 30 ft (9.1 m) and 43 ft (13.1 m) below ground surface. Hydrological studies associated with these remediation efforts have determined that groundwater in the area has a slight hydraulic gradient to the south and southeast (away from the Rio Grande).
Albuquerque municipal water service has been available throughout the study area since the 1970s, although a number of businesses and residences still utilize private wells. A public sewer system has only recently become available to much of the study area. Consequently, the majority of the study area has utilized individual liquid waste disposal systems (septic tanks and cesspools) for many years. There is no ordinance that requires property owners to connect to the public sewer system, but it is highly encouraged by the Village.
Currently storm water is collected by a stormwater collection system only in the City of Albuquerque (south of the project area). Throughout the project area, drainage from the roadway and from adjoining properties is provided by individual French drain systems (rock and gravel lined depressions). These systems may also serve to introduce contaminants into the groundwater. Where these systems are not provided, runoff remains along the roadway or on adjacent properties until it infiltrates or evaporates.
3.6.1 Water Quality and Drainage - Impacts
Impacts to water quality may occur if: 1) water quality (surface or groundwater) is degraded below state and federal standards; 2) roadway runoff or other nonpoint source pollution has an adverse impact on water resources; or, 3) the quality or quantity of water is contaminated to the extent that established uses are adversely affected.
No Build Alternative
Under the no build alternative, no additional impacts to ground water or surface water would occur; however, runoff would remain along the roadway or on adjacent properties until it infiltrates or evaporates.
Build Alternatives
All build alternatives will provide storm water collection. In the preferred roadway build alternatives, the four- and five-lane sections with curb and gutter and sidewalk, and in all intersection improvement alternatives, stormwater will be collected by the curb and gutters, filtered through drop inlets, and then transported to stormwater retention facilities. Each drainage collection system will be an independent system that collects stormwater for approximately 600 ft (183 m) of roadway. These drainage systems will be located throughout the length of the project.
Each drainage system will have drop inlets with filtration systems. The filtration systems will have a lined chamber capable of trapping roadway contaminants such as oil, grease, and other debris. From the drop inlets, stormwater will be transmitted to a trunk line under the center of the roadway and then transported to a series of stormwater retention facilities located approximately every 600 ft (183 m). The retention facilities will be underground basins capable of containing a 100-year rainfall event. The existing facilities north of Paseo del Norte on both the east and west sides of 4th Street will be aboveground.
Drop inlets with filtration systems will require periodic maintenance to remove collected debris and contaminants. The removed material will be disposed as a solid waste in a manner approved by local regulatory authorities.
The retention facilities will be designed to maximize protection of groundwater. Because the proposed retention facilities are within 50 ft (15 m) of groundwater, a notice of intent to discharge to groundwater will be filed with the New Mexico Environment Department's (NMED) Groundwater Bureau; however a discharge permit may not be required. Groundwater must be protected from the contamination contained within roadway runoff, and therefore all water quality standards and permit requirements for the protection of groundwater will be met. However, the storm water retention facilities will be constructed to provide maximum protection to groundwater and wildlife resources. Roadway runoff will be routed first into a lined chamber capable of containing design flows of a 5-year rainfall event. From this chamber, the discharge will overflow to an unlined area capable of containing a 100-year rainfall event and providing treatment of the influent by settling and dilution with storm water and eventually allowing the water to infiltrate. NMED Groundwater Bureau will review the design of the storm water retention facility and determine whether a discharge plan is required.
The four-lane section with shoulders and tapers will utilize gravel-lined swales to collect and transmit stormwater from ponding areas to French drains and then to stormwater retention facilities if necessary. The French drains will filter roadway runoff by use of filter cloth and gravel to trap roadway contaminants such as oil and grease and other debris.
Because of the depths to groundwater in the project area, it is not anticipated that "dewatering" (removal of shallow groundwater) will be needed for project construction, any temporary construction dewatering that occurs will be coordinated with NMED’s Surface Water Bureau. This will ensure that any contaminated groundwater removed is treated and disposed of in accordance with state and federal regulations.
3.7 Hazardous Materials - Existing Conditions
To identify problems or potential problems associated with hazardous materials, Wilson & Company completed an Initial Site Assessment (ISA) Report for the study area. This investigation was performed to evaluate the potential for soil or groundwater contamination that could preclude or favor certain improvement alternatives, adversely influence construction activities, or impact acquisition of ROW. In addition, the ISA identified areas where additional testing is required to thoroughly evaluate subsurface conditions.
As a result of the ISA, several problems or potential problems related to hazardous materials and past and current land uses were noted on 11 properties within the study area. Three of these properties were located outside the project area and would not affect the no build nor any of the build alternatives. Subsurface testing was recommended at the remaining eight sites. In addition to these sites, testing is recommended at an additional site that may be impacted by one of the realignment alternatives at the intersection of Osuna Road/Chavez Road/4th Street. As a result, subsurface testing is recommended at nine sites within the project area that may potentially impact project construction. These sites are discussed in detail in the appropriate Character Zone.
3.7.1 Hazardous Materials - Impacts
Impacts from hazardous materials may occur if: 1) contaminated properties are acquired for additional ROW; 2) soil or groundwater contamination is caused to spread during project construction; or, 3) contaminated properties pose a physical danger to construction crews.
No Build Alternative
No hazardous materials impacts would result from the no build alternative since no additional ROW would be acquired and existing soils would remain undisturbed. Any unknown hazardous materials that may have migrated into the existing ROW would also remain undisturbed under the no build scenario.
Build Alternatives
Proposed improvements associated with the build alternatives will result in subsurface disturbance near potentially contaminated sites. Once testing is completed on the potentially-contaminated sites, the presence and extent of subsurface contamination will be delineated and the impacts can be assessed. Once the impact assessment is completed, measures will be implemented to minimize risks from subsurface contamination. These measures may include:
The Preliminary Site Investigation (and Detailed Site Investigation, if recommended) will be completed prior to the plan, specification, and estimates (PSE) approval. The investigation will result in estimated quantities and special provisions to guide the handling and treatment of contaminated materials in the contract and construction documents.
Improvements to the storm water drainage system in all build alternatives will result in subsurface disturbances ranging from approximately 3 ft (0.9 m) to 10 ft (3 m). Construction of stormwater drainage detention facilities will result in subsurface disturbance to a depth of approximately 3 ft (0.9 m) and slightly less in the rural roadway alternatives. Roadway improvements will result in a disturbance approximately 3 ft (0.9 m) deep; however, the preferred roadway build alternatives will require the removal of a concrete slab under the existing roadway. The removal of this slab, 3 ft (0.9 m) deep and 20 ft (6 m) wide, will result in more extensive subsurface disturbance than the rural section. Lighting installations at intersections and along the corridor will result in subsurface disturbance of approximately 2 ft (0.6 m). All disturbances will occur within the proposed ROW.
Construction activity safety may be improved by minimizing or eliminating contact with hazardous materials and by training workers to deal with hazardous materials. Individual liquid waste disposal systems and agricultural practices may introduce pathogenic organisms, pesticides, or fertilizers into groundwater. Individuals that risk contact with these materials should be informed of the risks associated with such contact and should be trained and equipped to deal with the associated hazards. Because of the depth to groundwater and the degree of subsurface disturbance anticipated, dewatering will probably not be required. However, if dewatering is required, dewatering plans will include provisions to evaluate the potential for encountering contamination and plans for proper handling and disposal of contaminated groundwater.
In addition to those areas of known and suspected contamination discussed in the Initial Site Assessment, any construction project has the potential to discover new and previously undocumented cases of contamination. Construction of improvements to 4th Street would involve soil disturbance and ROW acquisition in some locations. Although the initial site assessment identified specific areas of known and suspected contamination, undiscovered hazardous substances could potentially affect the project. If previously undiscovered contamination is encountered during project construction, work will be stopped immediately and the necessary steps will be followed for the proper treatment and disposal of hazardous materials, as identified within current NMSHTD policy and guidelines.
Character Zone 1 (Solar Road to Schulte Road)
Osuna Road/Chavez Road/4th Street Intersection Alternatives
Preferred Roadway Build Alternative - Realignment of Chavez Road to Osuna Road and Resignalization
No affects or impacts from known environmentally suspect properties would occur as a result of construction of this alternative.
Realignment of Osuna Road to Chavez Road and Resignalization
This alternative would require acquisition of two commercial businesses and three single-family residences. If this alternative is selected, prior to demolition, an asbestos and lead survey of the buildings will be conducted. If the buildings contain asbestos, a licensed asbestos removal contractor will remove the asbestos containing materials. Removed asbestos will be treated, transported, and disposed of in a manner approved by NMED and any notifications required by the Occupational Health and Safety Bureau of NMED will also be strictly followed.
Lead-based paint was commonly used in buildings constructed prior to 1980. Prior to demolition of acquired buildings, a lead-based paint survey will also be conducted. If lead based paint is detected, it will be tested to determine if the material should be treated as a hazardous waste. If it meets the criteria for a hazardous material, the lead-based paint residue will be disposed of in a manner approved by NMED.
Because public sewer has only recently been available in the area, the three single family residences are assumed to possess septic tanks for liquid waste disposal. According to the property owner, both the paint and body shop and the dry cleaners utilize a single septic tank for liquid waste disposal. If these properties are acquired, the liquid waste systems will be surveyed and closed according to NMED standards.
The two commercial businesses (located in one building) to be acquired. One property is a small satellite facility for dry cleaning drop off and pick up with the actual dry cleaning occurring at another location. This location has been occupied by a dry cleaning business since 1985. During the ISA investigation, no hazardous substances were observed stored at this facility and no problems were noted.
One property was not investigated in the ISA because the alternative that would require acquisition of this facility had not yet been developed; therefore, a supplemental on-site interview and hazardous material questionnaire was completed. This property is an automotive paint and body shop that has occupied this location since 1990. Prior to this use, an automotive supply shop occupied this building (1970 to 1990). This property was not identified in the Site Environmental Audit (SEA) report as a property that handles, generates, treats, stores, or disposes of hazardous waste or reportable amounts of hazardous materials. No underground storage tanks were reported on the property and no hazardous materials incident reports were filed with the Fire Department for this business. During the on-site interview, paint thinner, waste thinner, diesel fuel, and raw paint material were observed stored in labeled, 55-gallon drums on the property exterior on cement pads. Staining under the containers was not observed; however, no secondary contaminant was provided. Waste thinner and used rags are collected and disposed of every other month by the EnviroSolve company. According to the business owner, their business uses approximately 330 gallons (1250 liters) of paint thinner and 160 gallons (606 liters) of diesel fuel annually. Approximately 2 to 3 cars are painted daily. The majority of the property is paved and little ground surface staining was observed.
Because a septic tank is located on the property and the tank continues to be used for liquid waste disposal, this property poses a concern if acquired for the build alternative. Although it appeared that paint and thinner wastes were being disposed of properly, incidental or unintentional hazardous waste may have entered the liquid waste disposal system over the past 10 years (e.g., through hand washing, brush, rag, equipment washing, or accidental spillage). In addition, although the current dry cleaning business operates as a satellite facility, it is unknown if dry cleaning ever occurred during its 13 years of businesses at this location. Therefore, because of the possible disposal of hazardous materials in the septic tank at some time in the past, testing is recommended to thoroughly evaluate subsurface conditions prior to acquisition.
Plaza Alternative
No affects or impacts from known environmentally suspect properties would occur as a result of construction of this alternative.
This alternative would require acquisition of one commercial building. Although the building was constructed relatively recently, prior to demolition, an asbestos and lead survey of the building should be conducted. If either is found, the materials will be removed and disposed of in the manner discussed previously.
4th Street Roadway Improvement Alternatives
Preferred Roadway Build Alternative - Five-lane roadway with raised center median, curb and gutter, and sidewalk
According to the ISA, further investigation was recommended for one site. This leaking underground storage tank site exhibited measurable contamination and is near 4th Street. Contamination was not fully delimited at this site.
Roadway improvements will result in a subsurface disturbance approximately 3 ft (0.9 m) deep; however, this alternative will require the removal of a concrete slab under the existing roadway. The removal of this slab, 3 ft (0.9 m) deep and 20 ft (6 m) wide, will result in extensive subsurface disturbances. These disturbances may encounter contamination at this site; therefore, additional investigations, including subsurface soil testing are warranted.
Character Zone 2 (Schulte Road to Ranchitos Road)
Ranchitos Road/4th Street Intersection Alternatives
No affects or impacts from known environmentally suspect properties would occur as a result of construction of either of the intersection improvement alternatives.
4th Street Roadway Improvements
According to the ISA, additional investigations, including subsurface soil testing, are warranted at the following five locations for either roadway improvement alternative:
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
Roadway improvements would result in a subsurface disturbance approximately 3 ft (0.9 m) deep; however, this alternative would require the removal of a concrete slab under the existing roadway. The removal of this slab, would result in extensive subsurface disturbances. These disturbances may encounter contamination at these sites; therefore, additional investigations, including subsurface soil testing, are warranted.
Four-lane roadway with shoulders and tapers
The new section centerline for this alternative would be offset approximately 8.0 ft (2.4 m) west of the existing centerline, requiring an additional 14 ft (4.3 m) of ROW along the west side of the roadway. This would require excavation closer to one site and may increase the risks of encountering contamination. These disturbances may encounter contamination at these sites; therefore, additional investigations, including subsurface soil testing, are warranted.
Character Zone 3 (Ranchitos Road to Ortega Road)
El Pueblo Road/4th Street Intersection Alternatives
Geometric Reconstruction and Resignalization
No affects or impacts from known environmentally suspect properties would occur with construction of this alternative.
4th Street Roadway Improvements
According to the ISA, subsurface investigation was recommended for two sites within this character zone:
Preferred Roadway Build Alternative - Four-lane roadway with curb and gutter and sidewalk
Roadway improvements would result in a subsurface disturbance approximately 3 ft (0.9 m) deep; however, this alternative would require the removal of a concrete slab under the existing roadway. The removal of this slab, would result in extensive subsurface disturbances. These disturbances may encounter contamination at these sites; therefore, additional investigations, including subsurface soil testing, are warranted. In addition, a proposed stormwater detention facility is located south of an environmentally suspect site. Subsurface disturbance at this proposed facility would be approximately 3 ft (0.9 m) deep and may encounter potential soil contamination from the neighboring site; therefore, subsurface testing will occur at this site prior to site selection and construction activities.
Four-lane roadway with shoulders and tapers
The new section centerline for this alternative would be offset approximately 8.0 ft (2.4 m) west of the existing centerline, requiring an additional 14 ft (4.2 m) of ROW along the west side of the roadway. This would require excavation closer to the environmentally suspect site at one site and may increase the risks of encountering contamination. In addition, a proposed stormwater detention facility is located south of the environmentally suspect site at one site. Subsurface disturbance at this proposed facility would be approximately 3 ft (0.9 m) deep and may encounter potential soil contamination from the neighboring site; therefore, subsurface testing will occur at this site prior to site selection and construction activities.
3.8 Existing and Planned Utilities - Existing Conditions
Underground gas, power, water, sanitary sewer, telephone, fiber optics, and cable television are all located within or adjacent to the corridor ROW. Overhead power and telephone parallel the entire project and services cross 4th Street at several locations.
Albuquerque municipal water service has been available throughout the study area since the 1970s, although a number of businesses and residences still utilize private wells. A public sewer system has only become available recently to much of the study area, consequently the majority of the study area has utilized individual liquid waste disposal systems for many years and are still not required to connect to the public sewer system. This, compounded with the shallow water table, may threaten the quality of the aquifer, which is the main source of water for the area.
According to PNM Gas Services, gas lines are located in the 4th Street ROW. The lines were installed in the 1940s and 1950s and are due for replacement. If relocation of these lines were required for roadway improvements, PNM would replace the lines five to six months before actual road construction began.
Electric power lines, both for distribution and major transmission, exist throughout the corridor. Poles are located both east and west within the ROW with distribution wires crossing the corridor at multiple locations. Along the east ROW line, a 46,000 volt sub-transmission service exists that was constructed in the mid-1920's. It provides continuous service to the Sandia Pueblo, Town of Bernalillo, Santa Domingo Pueblo, Santa Ana Pueblo, Algodones, San Felipe Pueblo, Cochiti Pueblo, and the southern outskirts of Santa Fe. Although removal of this line is not feasible, consolidation of the existing distribution lines and utility poles within the corridor may be possible. In addition to overhead distribution power lines, overhead telephone, TV cable, and corridor lighting occurs.
3.8.1 Existing and Planned Utilities - Impacts
Impacts to existing and planned utilities may occur if utility lines or utility services are disrupted for long periods of time or if the project interferes with any planned expansions or improvements to utility services.
No Build Alternative
No impacts to existing and planned utilities will occur under the no build alternative.
Build Alternatives
Other than possible short term interruptions in service, no impacts to underground utilities; such as gas, phone, water, or sewer, are expected to occur from construction of any of the intersection improvement alternatives or the four- or five-lane roadway with curb and gutters and sidewalks. If the four-lane roadway with shoulders and tapers is selected, however, some relocations of utilities would be required. This alternative would offset the roadway 8.0 ft (2.4 m) to the west and would require 14 ft (4.2 m) of additional ROW west of 4th Street to meet clear zone requirements. This shift would require that existing utility poles, lighting fixtures, and mailboxes along the west side of 4th Street be relocated outside the clear zone.
3.9 Mineral Resources
The Los Griegos and Alameda 7.5 minute topographic quadrangle maps do not indicate any active gravel pits or mines within the 4th Street study corridor; therefore, neither the no build nor any of the build alternatives would affect mineral resources in the project area.
3.10 Ambient Noise - Existing Conditions
FHWA established Noise Abatement Criteria (NAC) by land use as guideline traffic noise values (see Table 3.10-1). By definition, impacts occur when traffic noise levels approach (come within one dBA of) or exceed the NAC appropriate for a particular land use. Under these criteria, land uses such as residences, schools, motels, and churches are considered noise sensitive. All of these land uses occur within the project area.
To determine existing noise levels, field monitoring of traffic noise during peak traffic periods was conducted. Average noise levels were measured at three locations near the roadway using a Quest 1800 Sound Level Meter. Noise readings were recorded in A-weighted decibels (expressed as Leq dBA). Leq, or equivalent noise level, is a logarithmic, time averaged noise descriptor used by most state and federal agencies to describe the noise conditions within an area. These measurements demonstrated that existing noise levels were relatively consistent throughout the study area. Measured noise levels during peak traffic periods ranged from 69 Leq dBA near Los Ranchos Elementary School to 72 Leq dBA near the intersection of 4th Street/El Pueblo Road. In general, higher noise levels were recorded nearer the roadway. Highest noise readings occurred during the evening traffic peak period, except near the intersection of 4th Street/El Pueblo Road, where the morning traffic peak had higher measured noise levels. This was probably caused by higher traffic speeds in the southbound direction during the morning peak.
Table 3.10-1
FHWA Noise Abatement Criteria
|
Activity Category |
Description |
Leq (h) |
|
A |
Lands on which serenity and quiet are of extraordinary significance and serve an important public need. |
57 dBA |
|
B |
Residences, schools, parks, churches, libraries, hospitals, motels and hotels. |
67 dBA |
|
C |
Developed lands not included in Categories A or B above. |
72 dBA |
Source: Code of Federal Regulations, Title 23, Part 772
The field readings suggested that many residences and businesses in close proximity to the roadway currently approach or exceed the NAC. These readings also suggested that as traffic volumes increase with area growth, additional properties will approach or exceed the NAC.
Monitoring results were supplemented with computer modeling. Noise impacts resulting from roadway traffic were evaluated using the FHWA noise prediction model STAMINA2.0/OPTIMA (STAMINA). STAMINA utilizes local information on traffic volumes, speed, vehicle classification data, roadway lane configuration, and site acoustical characteristics to predict peak hour traffic noise at selected receiver locations. Traffic counts and projections were obtained from the traffic study prepared by Wilson & Company for this project. Traffic volumes for the implementation year 2000 were estimated by straight line interpolation between existing and projected horizon year 2020 traffic volumes. To adjust STAMINA for project area conditions, information collected during field measurements was entered in the model and the modeling results were compared to actual field measurements. Receiver sites for the noise modeling analysis were representative of land uses near the roadway, but residences were emphasized. Twenty-nine receiver locations were